Montebello Roofing CollectiveFree roof inspections for Montebello homeowners.(213) 671-0041Free estimate

Montebello, CA

Where the water goes after it leaves the roof

Gutters are the least interesting part of a roof and the cause of a surprising share of its problems.

Or call (213) 671-0041

Describe the gutters job

Three questions, then the address. Up to three Montebello contractors who do this work.

Or call (213) 671-0041

Free · Takes about a minute

Describe the gutters job

Three questions, then the address. Up to three Montebello contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

No cost to you. Contractors pay us, you do not.

Before you let anybody on the roof

The things worth pinning down on a gutters job. A contractor who has not raised them has not looked properly.

  • Where the water is discharged, and how far from the foundation
  • Condition of the fascia behind the old gutter
  • Gutter size against the roof area draining into it
  • Seamless or sectional, and what gauge of aluminium
  • Number and position of downspouts

Check the fascia before the gutter goes back up. Hanging new metal off soft wood buys you a year.

Guards reduce cleaning; they do not eliminate it. Treat any product sold as maintenance-free with suspicion.

Seamless aluminium formed on site is the default. Sectional gutter from a box store is cheaper and leaks at every joint within a few years.

Locally

The second problem is the marine layer keeping the north slope damp. The north side of a house here ages years faster than the south side, and almost every roof gets replaced because of it.

About gutters here

How much deposit is normal?

A third at most, and never the full amount. Pay the balance when the job is finished and you have walked it. Some states cap the deposit by law.

Do I have to hire anyone?

Not at all. Plenty of people use this to find out what a job costs and then do nothing for a year. That is a perfectly reasonable outcome.

Why three quotes and not one?

One quote is a number with no context. Three gives you a range, and the conversation about why they differ is where you learn what you are actually buying.

Should I take the cheapest quote?

Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.

Get it priced

Three questions, about a minute, and up to three Montebello contractors come back to you.

(213) 671-0041Call nowFree estimate